Sector desk · Publishes in week A of the cycle

01

Energy & Utilities

Oil and gas, power generation, grid operators and the renewables build-out.

Energy & Utilities — Meridian62 sector poster

Analysts

Amelia BaillieMSci Chemistry with Molecular Physics · Imperial College London
Hamza AldroubiBEng Integrated Mechanical and Electrical Engineering · University of Bath
Jaime Cortés VilaplanaMEng Chemical Engineering · Imperial College London
Milica JefticBSc Biochemistry · Imperial College London

Equities covered this term

SHEL Shell
LNG Cheniere
CEG Constellation Energy
IBE Iberdrola

Weekly notes

2 notes on the record

When this desk publishes
Week of 26 October 2026 Equity Iberdrola · IBE

Iberdrola's raised profit target set by grid construction, not power prices

By Amelia Baillie, Hamza Aldroubi, Jaime Cortés Vilaplana, Milica Jeftic · Energy & Utilities desk

What happened

Iberdrola (BME: IBE) released its nine-month results on 21 October 2026, showing that it now expects adjusted net profit to grow by more than 10% in 2026, after the first nine months saw a 9% rise to €5,141m [1]. Networks drove the result, with adjusted EBITDA up 15% to €6,430m, aided by the UK’s RIIO-T3 transmission framework from April, the NECEC power line in the US from January, and a new regulatory framework in Spain [1]. Its Power & Customers business, which is in charge of electricity generation and sales, saw EBITDA fall 2% to €5,359m, as sales made at 2025 prices met higher 2026 costs, alongside regulated gas rates and an increase in ancillary services [1].

What people are missing

The evidence suggests Iberdrola’s earnings growth is set less by what electricity sells for than by how much regulated grid equipment it builds, because a regulator, such as the CNMC in Spain, Ofgem in the UK or FERC in the US, sets a return on the net value of the assets a network needs to provide a public service, known as the regulated asset base (RAB) [2]. That return is set by the regulatory framework itself rather than by the market, and Iberdrola’s plan expects an average return on equity of 9.5% on its €37bn of network investment to 2028 [3], so earnings rise when the asset base does: RAB grew 14% to €56bn while networks EBITDA grew 15% [1]. The growth is physical, because every line, cable and substation must be built and energised before it contributes, as the NECEC line did when it entered service on 16 January [1][4], and as Brazil’s completed transmission lines now do with over €250m of annual EBITDA on a €4.3bn RAB [1]. On our calculation from the company’s rounded percentages, networks added about €0.8bn to EBITDA, roughly all of the group’s €827m rise, while Power & Customers lost about €0.1bn [1].

Why it matters

Iberdrola’s growth now depends mainly on how quickly it can build and connect power lines and substations, and on regulators continuing to let it earn an agreed return on them, which is the direction its plan sets, with 75% of its operating earnings targeted to be independent of energy prices by 2028 [3]. That makes it less exposed to swings in power prices, as it was in the first nine months of 2026 where Iberdrola attributes its Power & Customers losses partly to higher 2026 power costs [1]. Winning back every euro of the power shortfall would add only about 1% to operating earnings on our calculation, but it means delays to construction would cost far more than a weak year for power. Growth also has to be paid for, as its net debt rose €4.4bn since the end of 2025 to €54.6bn, which the company links to higher capital spending and currency moves [1].

What we are watching next

We are watching whether Iberdrola’s regulated asset base reaches the roughly €58bn, up 15%, that it forecasts for the end of 2026 [1], and what the company adds at its Capital Markets Day in March 2027 [1]. Reaching €58bn would support our reading that construction pace sets Iberdrola’s earnings, while a shortfall would suggest growth is arriving more slowly than planned, which a recovery in power would not make up.

Sources

  1. Iberdrola — Nine Months 2026 Results Presentation (21 October 2026)
  2. Iberdrola — Regulated Asset Base (RAB)
  3. Iberdrola — 2026-2028 Transformation Plan
  4. Iberdrola — New England Clean Energy Connect (NECEC)

Meridian62 notes explain what is happening and why. They are not investment advice and do not recommend buying or selling anything. Read the disclaimer.

Week of 5 October 2026 Equity Cheniere · LNG

Cheniere's growth limit is refrigeration power, not customers

By Amelia Baillie, Hamza Aldroubi, Jaime Cortés Vilaplana, Milica Jeftic · Energy & Utilities desk

What happened

Cheniere Energy (NYSE: LNG) has signed a 22-year agreement to supply Petrobras with about 0.8 million tonnes per annum (mtpa) of liquefied natural gas (LNG) on a free-on-board basis [1]. Chief executive Jack Fusco said the contract gives fixed-fee cash-flow visibility “to underpin further brownfield liquefaction capacity growth” [1], and it came days after staff at the US Federal Energy Regulatory Commission (FERC) issued the final environmental impact statement for Cheniere’s Sabine Pass Stage 5 expansion [2]. The obvious reading is that demand for US LNG is strong enough for customers to commit into the late 2040s.

What people are missing

The evidence suggests Cheniere’s binding limit is not customers but how much heat its plants can pull out of natural gas. Its liquefaction trains use the ConocoPhillips Optimised Cascade process, a series of cascading refrigeration circuits using single-component refrigerants. Each circuit is driven by large compressors, and every 1% change in compressor power shifts LNG output by roughly 0.8–1% [3][4]. On the hot US Gulf Coast, that power is squeezed from two sides. The gas turbines driving the compressors lose about 0.7% of their power for each 1°C rise in air temperature [5]. And because a liquid’s vapour pressure climbs steeply with temperature (the Clausius–Clapeyron relation), a warmer day forces the compressors to push refrigerant vapour to a higher pressure before it condenses, which takes more work and lowers summer output [6]. Upgrading existing trains can only add so much: Cheniere counts about 5 mtpa in operation [1], while Sabine Pass Stage 5 alone would add up to about 20 mtpa, built in two phases [7]. This suggests the Petrobras volumes are best read, as Cheniere itself frames them, as commercial support for capacity that still needs approval — not a call on spare output.

Why it matters

Cheniere can only produce as much gas as its cooling equipment allows. That means growing its exports over the long term depends on building new plants, not on finding new customers. Long contracts like this one help pay for that construction, but the extra gas only arrives once the expansion is approved and built, with first operations expected by 2030 [8]. Until then, hot weather can trim what the existing plants produce [6], however much customers want.

What we are watching next

FERC’s final decision on Sabine Pass Stage 5, which Cheniere has said it expects in late 2026, ahead of a final investment decision in early 2027 [9]. Approval on that timetable would support our reading that new capacity, not demand, sets Cheniere’s pace; a delay would leave new contracts waiting on gas that cannot yet be made.

Sources

  1. Cheniere Energy — Cheniere and Petrobras Sign Long-Term LNG Sale and Purchase Agreement (29 September 2026)
  2. FERC — FERC Staff Issues the Final Environmental Impact Statement for the Sabine Pass Stage 5 Expansion Project (25 September 2026)
  3. ConocoPhillips — Optimized Cascade Process brochure (March 2016)
  4. Texas A&M Turbomachinery Laboratory — Compressor Selection for LNG Liquefaction
  5. US Patent and Trademark Office — US Patent 10,502,484: System and Method for Liquefying Natural Gas with Turbine Inlet Cooling
  6. US Patent and Trademark Office — US Patent 9,709,325: Integration of a Small Scale Liquefaction Unit with an LNG Plant
  7. Cheniere Energy Partners — Second Quarter 2026 Results and Reconfirms Full Year 2026 Distribution Guidance (6 August 2026)
  8. The Center Square — Regulator Finalizes Sabine Pass LNG Expansion Environmental Study (28 September 2026)
  9. Investing.com — Cheniere Q2 2026 Slides: EBITDA Jumps 27%, Guidance Raised (6 August 2026)

Meridian62 notes explain what is happening and why. They are not investment advice and do not recommend buying or selling anything. Read the disclaimer.

More desks

Eleven sectors. One market.

Get the weekly round-up

One email a week when new coverage goes live. No spam, unsubscribe any time.